MAINTENANCE & REPAIRS
These lists are not intended to be exhaustive, there may be some exceptions to the items listed. Contact the Estate Office for advice.
YOUR RESPONSIBILITY
- Bathroom Extractor Fans.
- Carpentry, including Internal Draft Excluders.
- Decorating, including Painting/Paper-Hanging, Plastering Walls & Ceiling.
- Front Doors Fixtures & Fittings: locks, door handles & letter flaps' are the lessee's responsibility.
- Internal Doors.
- Drains, including Waste Blockages within Baths, Bathroom Sinks & Kitchen.
- Electrical Wiring, from the consumer side of meter to the consumer unit & all internal wiring.
- Fencing
- Fixtures & Fittings including Coat Hooks, Curtain Rails & Curtains
- Flooring, including Carpets.
- Wooden/Laminate: if you wish to install wooden flooring in your property, please contact the Estate Office for advice as you will need the Estate's consent.
- Furniture, Maintaining & Disposal
- Gas, Correct Fitting & Maintenance of your Gas Safety Applicances
- Kitchen, including Fixtures & Fittings
- Maintenance of Cold Water Storage Tank - i.e: ball valve/tank overflowing.
- Mould caused by lack of ventilation. How to Get Rid of Mould Guide
- Pest control, including bees, mice, and wasps.
- Plumbing Repairs & Leaks from Domestic Appliances & Leaking Taps
- Shower Fixture & Fittings
- Sanitary Fixture & Fittings, including Baths, Cisterns, Showers, Shower Curtains, Toilet Pans, WC Seats, Sink Units & Taps
- Shower Curtains, Replacement
- Skirting Boards & Stairs
OUR RESPONSIBILITY
- Brickwork, External
- Boilers in Boiler Room
- Carpark, both Overground & Underground
- Door Numbers
- Drains, external including Garden Drains. Descaling soil stacks and drains.
- Electricity, all Cabling up to your Meter
- Estate Office Building
- Front Doors, part of cyclical maintenance works, every 5-years. Last painted in December 2019.
- Heating & Hot Water, Open Vented Hot Water Cylinders where installed by the Estate, including Thermostats Hot Water Temperature Controls and Primary Insolation Valves.
- Gardens, Communal
- Garden Gates, part of cyclical maintenance works, every 5-years.
- Gutters
- Lifts
- External Lighting, including Underground Carpark, Communal Pathways & Stairwells
- Mains Water Supply up to and including Incoming Isolation Valves
- Plumbing & Repair, including Central Heating & Water Pressure.
- Radiators, including bleeding & Radiator Valves
- Railings, including Balcony, Boundary & Boundary Gates
- Roofs Replacement, including Kitchen Roofs. Part of cyclical maintenance works.
- Stairwells, painting. Part of cyclical maintenance works, every 5 years. Last painted in February 2020.
- Stopcocks, part of recent major program of works. changed in 2019/2020.
- Taps, where installed by the Estate.
- Windows, including Fixtures & Fittings